ISSN 1671-1092 CN 33-1260/TK

• 补强加固 • 上一篇    下一篇

吉林省沙河水库大坝病害分析及处理措施

杨恩波   

  1. 吉林省沙河水库管理局,吉林舒兰 132600
  • 出版日期:2012-12-28 发布日期:2012-12-28

Defect analysis and rehabilitation of Shahe reservoir

YANG En-bo   

  • Online:2012-12-28 Published:2012-12-28

摘要: 沙河水库运行中存在以下问题:坝基渗漏、大坝上下游坡抗滑稳定安全系数不满足规范要求、坝面砌石隆起及凹陷、防浪墙断裂等。通过分析有针对性地提出了沙河水库除险加固处理措施。

Abstract: In operation of Shahe reservoir dam, some problems were encountered, such as dam foundation seepage, lower coefficient of stability against sliding of the upstream and downstream slope than requirement in regulation, uplift and concave of the masonry as well as breakage of the wave wall. By analysis, the paper advanced treatment measures for rehabilitation.