重庆隘口水库岩溶坝基灌浆试验

何英1 ,李焰2   

  1. 1.葛洲坝集团公司基础工程有限公司,湖北宜昌 443000;2.葛洲坝集团公司试验检测有限公司,湖北宜昌 443002
  • 出版日期:2012-10-28 发布日期:2012-10-28

Grouting test for the karst foundation of Chongqing Aikou reservoir

HE Ying and LI Yan   

  • Online:2012-10-28 Published:2012-10-28

摘要: 重庆市秀山县隘口水库坝基为岩溶地区,坝基在固结、帷幕灌浆施工前按要求进行了灌浆试验。试验对设计提出的灌浆方法、技术参数和灌注材料等均进行了验证,试验结束,提出了技术性的建议意见。

Abstract: Chongqing Aikou reservoir was built on karst foundation. Before its consolidation grouting and curtain grouting for foundation, the grouting test was carried out. The test verified the grouting method, technical parameters and grouting materials. According to the test results, advices were presented.