ISSN 1671-1092 CN 33-1260/TK

• 设计研究 • 上一篇    下一篇

潮汐电站发电调度运行研究

陈晓芬,汤春义,陈国海   

  1. 中国水电顾问集团华东勘测设计研究院,浙江杭州 310014
  • 出版日期:2011-10-28 发布日期:2011-10-28

Study on generation regulation and operation of tidal power station

CHEN Xiao-fen, TANG Chun-yi and CHEN guo-hai   

  • Online:2011-10-28 Published:2011-10-28

摘要: 以潮汐电站满足综合要求同时发电量最大为目标函数,拟定潮汐电站发电运行方式,建立数学模型,计算发电量。提出潮汐电站发电量最大的调度运行方式,从而达到优化潮汐电站运行方式的目的,并以江厦潮汐电站为实例说明该研究的应用效果。

Abstract: Taking the synthetic requirements and the maximum power generation simultaneously satisfied as the object function, it is to develop the operation mode of the tidal power station, establish the mathematic model and calculate the generation. The regulation operation mode with the maximum power generation is proposed for the tidal power station in order to optimize its operation mode. Meanwhile, taking Jiangxia tidal power station as an example, the paper showed the applicable result of this research.