ISSN 1671-1092 CN 33-1260/TK

• 资料分析 • 上一篇    下一篇

克孜尔水库主坝渗流监测资料分析

买买提1,沈振中2,夏新利1,祖丽菲娅1   

  1. 1.新疆克孜尔水库管理局,新疆拜城 842313; 2.河海大学水利水电工程学院,江苏南京210098
  • 出版日期:2009-02-28 发布日期:2009-02-28

Analysis on seepage monitoring data for main dam of Kezier reservoir

Maimaiti, SHEN Zhen-zhong, XIA Xin-li and et al.   

  • Online:2009-02-28 Published:2009-02-28

摘要: 根据工程实际情况,详细分析了主坝坝体测压管水位、孔隙水压力、渗流量等观测资料,从安全监测的角度评价了主坝的运行状态。分析表明了主坝右肩存在渗流稳定问题。

Abstract: In this paper, monitoring data of piezometric level, pore water pressure and seepage of main dam was analyzed, as well, dam safety was evaluated. The analysis result indicated the problem of the bad seepage flow behavior of right dam abutment existed.