ISSN 1671-1092 CN 33-1260/TK

• 设计研究 • 上一篇    下一篇

龙滩水电站碾压混凝土坝应力应变、渗流安全监测设计布置与实施

徐辉1, 谢基祥2   

  1. 1.龙滩水电开发有限公司工程建设部, 广西天峨 547300; 2.中国水利水电第七工程局龙滩水电站安全监测项目部, 广西天峨 547300
  • 出版日期:2007-08-28 发布日期:2007-08-28

Strain,stress and seepage safety monitoring at Longtan roller compacted concrete dam

XU Hui and XIE Ji - xiang   

  • Online:2007-08-28 Published:2007-08-28

摘要: 详细介绍了龙滩水电站大坝安全监测的应力应变和渗流监测系统, 并从仪器选型、仪器埋设质量和施工方法等方面对设计布置进行了实施。

Abstract: This paper introduced the strain, stress and seepage safety monitoring systemat Longtan reservoir dam. The construction was carried out in the aspects such as the type of instruments, the embed quality and construction method.